Welcome To b2b168.com, Join Free | Sign In
中文(简体) |
中文(繁體) |
Francés |Español |Deutsch |Pусский |
| No.8096794
- Product Categories
- Friendly Links
Information Name: | Supply of Beijing professional dewatering company |
Published: | 2013-09-05 |
Validity: | 365 |
Specifications: | |
Quantity: | 1.00 |
Price Description: | |
Detailed Product Description: | Beijing Construction Engineering Construction Co., Ltd. based on precipitation. Company to undertake professional: medium-sized deep drilling, engineering wells, water wells, air conditioning wells, difficult project precipitation, dewatering, pipeline precipitation, river precipitation, pipe jacking precipitation, well point dewatering professional construction team. The company has specialized machinery drilling, founded in 1989, strong technical force, advanced equipment, with the two chief engineer, the aqueous layer three geological engineer, engineers, six, eight drilling engineers, drilling technology division nineteen people, engaged in Thirty eight years of skilled workers. Machine Model: SPJ-500-type drill three wells, SPJ-300-type wells drilled four, SPJ-200-type drill six wells, stone drilling machine two (preferably 600 meters), SPJ-150-type drill eight wells , SPJ-100-type wells drilled nine, enterprises and institutions to meet the water 4-400 tons / hour, well point dewatering device 68 group, deep down pump 980 units. This well may direct water supply for industrial production of a wide range of bath leisure center uses. Can also be used for farming, irrigation can also be used as shopping malls, hospital central air conditioning can also be configured for various business units fire emergency backup water source. This well is a must prepare all enterprises and institutions, cool, inexhaustible, with the finish. Well a good amount of water per hour can be achieved 4-400 tons or more (depending on demand), water is definitely taking on tens or even hundreds of meters below the ground below the water level, the water is clear pure taste. A deep water only to solve the urgent, but also save a lot of water and sewage charges, to bring the economic benefits of the double, the real purpose of an investment in long-term benefit. Deep well construction process: A.: Medium deep by the PPR plastic pipe diameter is 160mm, drilling of 300mm, around the pitch between the fill sand, according to the geology and topography to determine the depth and water. B:. Large deep high-pressure, high-temperature cement products, pipes, wells and tube diameter 360mm, length of 4 meters each, two connecting steel hoop, two direct welded connections, drilling diameter is 600mm, depth of up to 100-600 m , surrounded by quartz sand filling between pitch, how much water usage decisions based on the Company, ensuring water. Dewatering Program - There are two dewatering well construction program: A.: There are deep precipitation (large diameter precipitation), the effect of precipitation depths up to 60 meters, the circumference and diameter of 40 meters, according to the terrain, geological report to determine the construction program. B.: well point dewatering (vacuum tube inserted precipitation), the effect of precipitation depth of up to 7 meters, circumference and diameter of each set according to each group to decide, according to the geological report and the final plan for the construction to determine the program. Drilling Specifications: Diameter 100mm-1600mm, depth of 10-600 meters, the water :4-100 tons / hour. Dewatering wells Specifications: There are deep precipitation (large diameter rainfall), well point dewatering (vacuum tube inserted precipitation), slim point dewatering three. Services: 1. Well point dewatering, iron pipes, Bowen tubes, six charge (playing slim, drilling large wells) high pressure vacuum pumps and other programs precipitation 2. Various drilling deep wells, central air conditioning wells, stone wells, irrigation wells, plant with deep wells (10 --- 200 meters) per hour, water (6-100 tons) 3. Drilling deep wells, mechanical cooling water, water conditioning wells, drinking water wells, irrigation wells, central air conditioning configurations wells, plants use wells, old wells alteration, repair deep well pump, water consumption can be customized according to your company's needs. Construction of precipitation, a large pit, difficult project precipitation, dewatering, pipeline precipitation, river precipitation, pipe jacking precipitation, well point dewatering our technical expertise, advanced equipment, low prices, construction specifications, the staff treat more Sincerity, good service attitude. Our desire is to make you spend the least money, with the shortest time to complete the task. The Company adequate equipment and excellent construction team can meet your requirements. Our procedures are complete, please call to discuss. I believe that our cooperation is very happy. |
Admin>>>
You are the 5740 visitor
Copyright © GuangDong ICP No. 10089450, Foundation Engineering Co., Ltd. Beijing Huasheng All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility
You are the 5740 visitor
Copyright © GuangDong ICP No. 10089450, Foundation Engineering Co., Ltd. Beijing Huasheng All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility